v12.1.0 Fix Rapid Closed Door measure report showing duplicate measure information. Fix Lighting Controls to update new operating hours for new line items. Fix Fan System Upgrades measure report to display fan control description. Fix Fan System Upgrades screen to prevent crashing when exiting without information. Add Boiler BHP to BTU/HR conversion for the input and output. Fix misspelled city names that cause system crash. Calculate Air-Side Economizer kWh savings and kW reduction based on (Existing - Proposed). Fix divide by zero display errors and calculations on High Efficiency Motors. Fix accessing documentation from measure input screens. Fix rounding and display issues on all measures. Add "Air-cooler Fan Drive Motor Information" to the Compressed Air System Upgrades report. Update the navigation buttons look on the Fan System Upgrades measure. Make the "City" a required selection on the Peak Demand Incentive Worksheet Fix Peak Temperature rounding issue in the Refrigderated Tank Insulation measure. Fix Third Party Payee information to be saved on new and imported projects. Update Deer Peak Period dates. Add BTU/HR and BHP dropdowns to Boiler Measure. Rework the www.spc-nrrdr.com webpage. v12.0.0 First public release of the Customized Calculation Tool (SPC2010) Remove ability for SCE to create or edit application Update Manuals and Applications for 2010.